News Releases

HOME AGGREGATE TECHNICAL NEWS QUOTE INFO LINKS CONTACT Au/Ag
For Immediate Release

November 23, 2004

Technical Update

Golden Queen Mining Co. Ltd. is developing the Soledad Mountain Project (the Project) in southern California as a gold/silver heap leach operation. 

Flow Sheet

A flow sheet that uses a high pressure grinding roll (HPGR) for preparing the ore for heap leaching has been developed for the Project. 

The primary ore types that will be mined are rhyolite (68.1 %) and quartz latite (21.3 %). The HPGR and confirmation bottle roll and column leach test work on the rhyolite ore has been completed.

Quartz Latite Test Sample

A sample of quartz latite ore was taken for HPGR and confirmation bottle roll and column leach tests in April 2004. The HPGR tests were done with a range of specific press forces in the laboratory of Polysius AG in Germany in September and November 2004. The samples have been returned to McClelland Laboratories, Inc. in Nevada where the leach tests are underway. 

Gold & Silver Recoveries In Bottle Roll Tests – Quartz Latite Test Sample

The following gold and silver recoveries were obtained in duplicate bottle roll leach tests that have just been completed:

Specific press force 3.17 N/mm2 3.53 N/mm2 4.12 N/mm2
HPGR product tested Total Product Total Product Total Product
Hours leached 408 408 408
Actual gold recovery 86.7 % 87.4 % 86.0 %
Actual silver recovery 51.3 % 54.3 % 48.8 %

These recoveries compare favorably to gold and silver recoveries of 70.4 % and 39.6 % respectively, obtained in duplicate bottle roll tests on a sample of quartz latite ore in 1997 in 120 hours of leaching. Conventional crushing and screening was used to prepare the ore sample for the leach test work.

An independent qualified person has confirmed the above test results.

Summary

Polysius AG is preparing the detailed design of the commercial HPGR, which will have the ability to operate with a maximum specific press force of 5.0 N/mm2.

All indications are that the HPGR will be an effective tool to prepare ores for heap leaching and the HPGR will be key for a viable project. 

The indicated benefits of using the HPGR will be:

• Higher recoveries in a heap leach operation due to micro-fracturing of particles;
• Lower capital costs when compared to a conventional crushing-screening plant;
• Lower energy consumption and thus lower operating costs.

Feasibility Study

Every element of the Project is being reengineered in an effort to find sound technical and cost-effective solutions. This work is proceeding rapidly and it is expected that this can be completed by December 31, 2004.

Golden Queen Mining Co. Ltd.

“H.L. Klingmann”

H. Lutz Klingmann, President

The current number of issued and outstanding shares is 60,995,446.

THE TORONTO STOCK EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS PRESS RELEASE.

back to news page

HOME | AGGREGATE | TECHNICAL
NEWS RELEASES | STOCK QUOTE | CORPORATE INFORMATION 
  LINKS | CONTACT US |
GOLD & SILVER 

© 2002 - 2004  Golden Queen Mining Corp. & Digisys Imaging Systems & Consulting.
 All rights reserved.